Cloud & Infrastructure · 02 of 06

Move to cloud without a rewrite you did not budget for.

Assessment, landing zones and wave-by-wave migration — re-host what should be re-hosted, refactor only where the return justifies it.

Azure & AWSLanding zonesWave planning
In short

Cloud migration is the staged move of applications and data from owned infrastructure to a cloud platform. We assess each workload, build the landing zone, choose a re-host, re-platform or refactor pattern, migrate in waves with rehearsed cutovers, then optimise cost and resilience after the move.

Quick answers

Re-host or refactor?

Re-host by default: it is faster, cheaper and reversible. Refactor where the application blocks cloud benefits or is being rewritten anyway. A migration that becomes a modernisation programme rarely finishes on budget.

How do you size the migration?

By workload count and dependencies, not by server count. We inventory applications, map their integrations and group them into waves that can move without breaking each other.

What about the data centre contract?

It often sets the deadline. We sequence the highest-dependency workloads early so the exit date is achievable rather than optimistic.

What we deliver

What does Cloud Migration include?

Each engagement is assembled from these blocks — take the whole set, or the part your programme is missing.

01

Assessment

Application inventory, dependency mapping and a per-workload migration pattern.

02

Landing zone

Accounts, networking, identity, logging and guardrails before the first workload moves.

03

Migration patterns

Re-host, re-platform or refactor, chosen on cost and risk.

04

Data migration

Database and file moves with reconciliation and a rollback position.

05

Cutover

Rehearsed switchover windows, DNS and connectivity tested in advance.

06

Optimisation

Right-sizing, reserved capacity and storage tiers after stabilisation.

Where it pays off

Where does Cloud Migration pay off?

These are the patterns that account for most of the demand we see in enterprise programmes.

01

Data centre exit

A dated lease or hardware refresh forces the move.

Infrastructure
02

Application modernisation

Legacy platforms re-platformed as part of the move.

Modernisation
03

Disaster recovery

A second region that is tested, not theoretical.

Resilience
04

Cost reduction

Owned hardware replaced by elastic capacity.

FinOps
How we work

How does an engagement run?

Four stages, one team: frame the use case, prototype on your data, harden for production, then run and improve. You see working output at the end of each stage.

01

Frame the use case

Business objective, data readiness, risk and the metric that will prove value — written down before any code.

Output: scoped use case
02

Prototype on your data

The smallest credible build, tested against a baseline your team already trusts.

Output: working prototype
03

Harden for production

Architecture, access control, guardrails, evaluation harness and cost limits.

Output: release candidate
04

Run and improve

Monitoring, quality review and a release cadence that keeps the system honest as usage grows.

Output: supported service
Stack

Which tools do you work with?

Tooling follows the problem: these are the platforms and frameworks our teams work in daily.

Platforms

Microsoft AzureAWSGoogle CloudHybrid

Tooling

Azure MigrateAWS MGNTerraformAzure Site RecoveryCloudEndure

Operations

Azure MonitorCloudWatchCost ManagementBackup
Questions

What do buyers ask first?

The questions that come up in almost every first call — answered directly, so you can qualify us before you speak to us.

How long does a migration take?
A single application can move in weeks; an estate of dozens is a programme. The landing zone and dependency mapping usually set the pace, not the compute.
Will performance drop?
It should not, if sizing and connectivity are designed for the workload. We benchmark before and after, and tune instance families where latency matters.
Can you migrate regulated workloads?
Yes, with the compliance controls mapped to cloud services first: data residency, encryption, logging and access review documented before cutover.
Related

Often bought together.

Start with the use case. We will bring the architecture.

Tell us the outcome you need and the constraints you work within. You will get a point of view and a delivery plan — not a brochure.